Sign In | Join Free | My benadorassociates.com
China Cangzhou Astar Machinery Co., Ltd. logo
Cangzhou Astar Machinery Co., Ltd.
Verified Supplier

5 Years

Home > Powder Coating Spare Parts >

Top Powder Pipe Assembly Electron E-Gun C1/C2 Manual Gun

Cangzhou Astar Machinery Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Top Powder Pipe Assembly Electron E-Gun C1/C2 Manual Gun

  • 1
  • 2

Brand Name : Electron

Model Number : B07 EC0002

Certification : CE, ISO9001

Place of Origin : Cangzhou, China

MOQ : 1 Piece

Price : Negotiable

Payment Terms : T/T, Western Union, L/C, D/A, D/P, T/T, MoneyGram, PayPal

Supply Ability : 100 pieces per month

Delivery Time : 5 - 8 work days

Packaging Details : Plastic bag

Name : Top Powder Pipe Assembly

Part number : B07 EC0002

Model : E-Gun C1/C2

Application : Electron E-Gun C1/C2 Manual Powder Coating Gun

Advantage : Durable

Size : Standard

Delivery time : 3 Days

Warranty : 1 year

Contact Now

B07 EC0002 E-Gun C1/C2 Top Powder Pipe Assembly Electron E-Gun C1/C2 Manual Gun

Introduction


The E-GUN C1/C2 Top Powder Pipe Assembly(B07 EC0002) consists of
E-GUN C1/C2 Top Powder Pipe (C07 520010) and O-Ring Ø15X2 Nbr70 (H02 015200).

Application

Electron E-Gun C1/C2 Manual Powder Coating Gun.

Quick Details

Name

Top Powder Pipe AssemblySizeStandard

Part number

B07 EC0002CertificationCE, ISO9001
ModelE-Gun C1/C2Place of OriginCangzhou, China
AdvantageDurableDelivery time3 Days
ApplicationElectron E-Gun C1/C2 Manual Powder Coating GunWarranty1 year

Advantages and selling points

1. Size standard.
2. Original quality.
3. Good quality.
4. Long working life.

Package

Paper box package

Company introduction

Astar Machinery Co., Ltd. is a comprehensive service in production, R&D; and sales, operates mainly in electrostatic spraying equipment, including electrostatic dust elimination equipment; electrostatic flocking machine, electrostatic powder spraying machine, electrostatic liquid spray machine, electrostatic spraying gun, high voltage module, circuit board, powder barrel, powder tube, Hv cable, reciprocator, spraying room, control cabinet, oven, oven, vibration sieve, the wind leaching room.

Picture

Top Powder Pipe Assembly Electron E-Gun C1/C2 Manual Gun

Top Powder Pipe Assembly Electron E-Gun C1/C2 Manual GunTop Powder Pipe Assembly Electron E-Gun C1/C2 Manual Gun


Product Tags:

Manual Powder Coating Gun Pipe Assembly

      

Pipe Powder Coating Spare Parts

      
Quality Top Powder Pipe Assembly Electron E-Gun C1/C2 Manual Gun for sale

Top Powder Pipe Assembly Electron E-Gun C1/C2 Manual Gun Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Cangzhou Astar Machinery Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)